Riechers Engineering
California SB9 Lot Split Guides

California SB9 local guide

SB9 in Long Beach: Urban Lot Split and Property Guide

Understand Long Beach SB9 lot split rules, R-1 zoning, tentative parcel maps, 40/60 lot size, coastal review, and property feasibility.

The free review starts with the property details. Riechers checks the local SB9 path and follows up if the parcel looks worth exploring.

Prepared from official sourcesRiechers Engineering's California SB9 project team prepared this guide using current state and local agency sources. It is informational only; final eligibility, approvals, timing, value, tax, financing, and legal outcomes depend on the property and agency review.

Free eligibility review

Want to know if SB9 works for this Long Beach property?

Send the property details through the eligibility checker and Riechers can review zoning, lot layout, access, utilities, and major feasibility constraints before you spend money on plans or applications.

Get a Free Long Beach SB9 Review

Quick Answer

In Long Beach, an SB9 Urban Lot Split may divide a qualifying single-family parcel into no more than two lots. The City's public guidance identifies R-1 zoning districts as the starting point and requires a Tentative Parcel Map before the final map process.

The first question is not simply whether a lot is large. A useful review considers the R-1 zone, statewide housing and environmental limits, the 40/60 split, existing structures, access, utilities, the future building layout, and whether the property is in the Coastal Zone.

Long Beach's Two SB9 Paths

SB9 can be used for a two-unit development on one parcel, an Urban Lot Split, or a coordinated strategy that uses both. A split is not required just to add an SB9 unit. It becomes relevant when the owner wants two legal parcels and a practical plan for each.

The City explains that an Urban Lot Split may create no more than two lots. The smaller lot must be at least 40 percent of the original parcel, and the City's current guidance identifies a 1,200-square-foot minimum for each new parcel. Those area tests do not replace the need to test access, utility service, building envelopes, and map requirements.

What Long Beach Reviews Before a Split

Long Beach directs applicants to the Planning Bureau first. Its guidance calls for a Tentative Parcel Map entitlement and an Urban Lot Split Affidavit of Owner Occupancy. After that approval, the Public Works Department processes the Final Parcel Map.

The City also warns that the Tentative Parcel Map must be approved before plans are submitted for a two-unit development when that development would not otherwise be allowed without the split. That makes early parcel strategy important: a house, ADU, driveway, or utility route that looks workable today can make the future lot line much harder to approve or build around.

Zoning, Coastal, And Parcel Constraints

Long Beach's public materials identify the R-1-S, R-1-M, R-1-T, R-1-N, and R-1-L districts for its SB9 framework. The property should still be screened for the complete state and City eligibility rules, including protected housing, tenant history, historic resources, hazard areas, and any applicable coastal process.

For a practical feasibility review, the important questions include:

  • Can the proposed parcels each support a useful home layout?
  • Does each resulting parcel have legal and physical access to the street?
  • Can water, sewer, power, drainage, and other services reach both parcels?
  • Do existing structures, garages, easements, trees, or utility lines block the best split line?
  • Is a coastal permit or other local approval path involved?

Map, Engineering, And Recordation

The map process is not a paperwork afterthought. Long Beach points owners to subdivision regulations in Title 20, including design standards and tentative-map rules. The City's planning guidance also notes that public improvements or dedications can be required through a tentative map under applicable local rules.

A good project begins with a survey-informed layout, a title and easement review, a utility and drainage look, and a realistic picture of the future development. That work helps determine whether the property is merely eligible on paper or actually supports a durable two-parcel strategy.

SB9 Or ADU In Long Beach?

An ADU can make sense when the goal is additional space or rental income on the existing parcel. An Urban Lot Split can be more relevant when the owner wants a separate legal parcel, subject to the property's eligibility and the final map process. The decision should be made before major design or construction work locks the site into a layout that does not support a later split.

Helpful next reads:

Start With A Long Beach Property Review

The strongest next step is to review the address, zoning, current site layout, access, and the owner's long-term objective before commissioning plans or a map. Start with the SB9 eligibility checker and include the Long Beach property address and any existing or proposed ADU work.

Frequently Asked Questions

Does Long Beach require a Tentative Parcel Map for an SB9 lot split?

Yes. Long Beach's current guidance says an Urban Lot Split requires a Tentative Parcel Map entitlement followed by a Final Parcel Map process through Public Works.

Does an SB9 lot split have to create equal lots in Long Beach?

The City's guidance says the lots must be roughly proportional. The smaller lot must be at least 40 percent of the original lot area, and each new parcel must meet the City's stated 1,200-square-foot minimum.

Can I build an SB9 unit in Long Beach without a lot split?

Potentially. The City states that an Urban Lot Split is not required just to develop the second principal dwelling unit permitted under SB9. The right path depends on the property and the owner's goal.

Official Sources

Statewide:

City of Long Beach:

Next step

Get a free SB9 review before you commit to a lot split plan in Long Beach.

The review starts with the actual parcel, then checks the local SB9 path, engineering constraints, and whether a real strategy is worth exploring.

Scroll to Top